Service guidance
Commercial Refrigeration Installation
Planning a new system or replacing existing equipment? Gather the details below so the proposed scope can be discussed.

What to prepare
- Equipment dimensions and delivery-route measurements
- Available electrical supply, drainage and ventilation details
- Proposed location, equipment model and desired installation date
- Responsibility for permits, related trades, commissioning and handover
Plan for the whole site
Provide the proposed cabinet layout, equipment schedule, loading needs and operating conditions. Confirm delivery access, ventilation clearances and which party will provide electrical and drainage connections. Capacity selection and commissioning requirements should be agreed before an equipment order is placed.
Before work is arranged
Confirm equipment compatibility, service location, scheduling, assessment costs and written scope directly. Any monitoring arrangement, warranty or follow-up responsibility must be agreed explicitly.